• news-banner

    Expert Insights

Q&A: Responding to operator requests for Code rights

Question

I have a mobile phone operator in occupation of my site under a tenancy granted before the new Code came into force and which is continuing under section 24 of the Landlord and Tenant Act 1954 (the 1954 Act). The operator is asking me to enter a new Code agreement for a term of 10 years. Do I have to agree to this?

Answer

In short, no you do not. An agreement conferring Code rights can only be entered into with the occupier of the land and the operator is unable to serve notice requiring you to confer Code rights while it is the occupier. Instead the operator would need to go down the route of making an application for a new tenancy under the 1954 Act.

Explanation

The Electronic Communications Code, contained in Schedule 3A to the Electronic Communications Act 2003 (the Code), grants Code operators the right to install electronic apparatus on, under or over land. Usually, a Code operator will serve a notice on an occupier, who then has 28 days to confirm whether it is willing to confer the Code rights sought. If the occupier will not agree, the operator can apply to the tribunal for the rights to be imposed on the occupier, and for such rights to bind others.

In Cornerstone Telecommunications Infrastructure Ltd v Compton Beauchamp Estates [2019] EWCA Civ 1755; [2019] PLSCS 201, the court held that only the occupier of land can enter into an agreement conferring Code rights. In that case, another operator was already in occupation of the site, and so it was not possible for CTIL, as a different operator, to serve a notice on the landowner seeking Code rights.

Similarly, in Cornerstone Telecommunications Infrastructure Ltd v Ashloch Ltd and another [2019] UKUT 338 (LC); [2020] EGLR 2, CTIL occupied a site under a subsisting agreement, namely a protected tenancy granted before the new Code came into force. The tribunal held that CTIL would have to follow the renewal procedure under the 1954 Act and could not choose to proceed under the Code, since it was already the occupier of the site under the subsisting agreement. Any new tenancy granted would, however, be an agreement to which the Code applies.

The operator has obtained permission to appeal the Ashloch decision.

Question

I am the owner-occupier of a building with no plans to redevelop. An operator has sought permission to access the roof of the building to enable it to carry out a multi-skilled visit (MSV) in order to assess whether or not it would be a suitable site for a new mast. Can I refuse the operator’s request?

Answer

The right to carry out an MSV is a Code right and so there are limited grounds of refusal. If you do not agree, the operator is likely to make an application to the tribunal for an order granting the right.

Explanation

Cornerstone Telecommunications Infrastructure Ltd v University of London [2019] EWCA Civ 2075; [2019] EGLR 58 confirms that the right to carry out an MSV is a Code right and the operator could serve a notice on the occupier seeking such a right. If the parties were unable to agree, the operator could apply to the tribunal for an order imposing the Code rights sought, provided that the applicable conditions in paragraph 21 were satisfied. The first condition is that any prejudice can be adequately compensated by money and the second condition is that the public benefit likely to result from the making of the order outweighs the prejudice to the relevant person.

The decision also confirms that the operator can make a freestanding application for interim rights under paragraph 27 of the Code, without needing to also apply for permanent Code rights under paragraph 20.

While interim Code rights are time-limited and do not attract security of tenure under the Code, the advantage for the operator is that it only needs to demonstrate that it has a “good arguable case” that the conditions are satisfied at a summary hearing, as opposed to proceeding to trial.

Where the operator is seeking to exercise rights which are, by their very nature, time-limited, the imposition of interim Code rights will suffice. If, following the MSV, the operator wants permanent Code rights to install apparatus, it will need to apply for them in the usual way.

In Cornerstone Telecommunications Infrastructure Ltd v Central Saint Giles General [2019] UKUT 183 (LC); [2019] PLSCS 106, the tribunal warned that parties should seek to agree reasonable terms of access for MSVs without incurring excessive costs.

This article was first published in Estates Gazette on 12 May 2020.

Camilla Lamont is a barrister at Landmark Chambers and Georgina Redsell is a senior associate at Charles Russell Speechlys LLP. For more information, please contact Georgina on +44 (0)20 7203 8897 or at georgina.redsell@crsblaw.com.

Our thinking

  • Building Safety and the challenges for UK construction - where are we now?

    David Savage

    Events

  • Women in Leadership: Resilience in Entrepreneurship

    Events

  • Dominic Lawrance and Catrin Harrison write for Tax Journal on the implications of the Court of Appeal judgment in the case of ‘A Taxpayer v HMRC’

    Dominic Lawrance

    In the Press

  • The Telegraph quotes Sarah Jane Boon on Labour’s plans for cohabitation reform

    Sarah Jane Boon

    In the Press

  • Something Changed – Landlord recovers possession of iconic music venue

    Samuel Lear

    Quick Reads

  • Implications of Johnson v FirstRand – will secret commissions pave the way for claims from Auto ABS noteholders?

    Caroline Greenwell

    Insights

  • When is 20% not 20%? The real impact of the proposed changes to business property relief on trading companies

    Sarah Wray

    Quick Reads

  • Joseph Evans, Cassidy Fan and Jessica Boxford write for New Law Journal on the future of insolvency: a digital asset revolution

    Joseph Evans

    In the Press

  • Cohabitation law reform

    Hannah Owen

    Quick Reads

  • Property Patter - Lifetime achievements: Katie Kopec of JLL

    Emma Humphreys

    Podcasts

  • Charles Russell Speechlys finds that Gen Z prioritises financial planning and saving amidst growing economic challenges

    Sally Ashford

    News

  • Law 360 quotes Stewart Hey on the potential integration of the PSR into the FCA and the impact on APP fraud reimbursement

    Stewart Hey

    In the Press

  • Is grey belt the key to unlocking growth in the logistics sector?

    Sadie Pitman

    Quick Reads

  • Kevin Gibbs and Sadie Pitman write for CoStar on the need for investment in power infrastructure to support new data centres

    Kevin Gibbs

    In the Press

  • New code of practice for the cyber security of AI development

    Rebecca Steer

    Quick Reads

  • Drapers quotes Kerry Stares on the potential for a review of the Modern Slavery Act 2015

    Kerry Stares

    In the Press

  • EU Design Legislation Updates

    Matthew Clark

    Insights

  • The EU Omnibus: resetting the rules on sustainability due diligence

    Kerry Stares

    Insights

  • The Times and Daily Mail quote Dan Pollard on new changes to the Employment Rights Bill

    Dan Pollard

    In the Press

  • Extra Time: The business of women’s football in Africa

    Sarah Johnson

    Podcasts

Back to top